![]() |
![]() |
These are the pictures from the MCA Engineering class bridge building project for Dyers Creek on the Superior Hiking Trail. The bridge was first assembled in the school parking lot and then taken apart and hauled by trailer to the trail head near Dyers Lake in northern Minnesota. The bridge was constructed at Dyers Creek on May 27-29, 2010. |
| Click on any of these pictures to see the full-size picture. Right click on that picture and select Save picture as... to download the full-sized picture. |
Link to Symmetry Solutions (SolidWorks) Article